Create a preliminary bathroom renovation budget with
labour and material allowances shown separately.
Package pricing is based on Built Wright estimator
planning data, then adjusted for bathroom size,
scope and selected upgrades.
Built WrightEstimator Planning Model
ProjectPackageProductsUpgradesEstimate
Step 01
Project details
Choose the bathroom configuration and enter the
approximate dimensions of the renovation area.
Bathroom Package
These configurations follow the supplied Built Wright
estimator training matrix. The Accessibility Bathroom
Conversion is a fixed CAD $15,000 base package; optional
upgrades selected later are added separately.
Approximate Dimensions
Used to adjust the package allowance above or below
its reference bathroom size.
Project Timing
Step 02
Scope & finish package
The Basic, Upgraded and Premium packages use the
supplied Built Wright labour/material matrix.
Scoped changes are then added or removed separately.
Renovation Scope
Standard assumes the existing footprint and plumbing
locations generally remain unchanged.
Finish Package
This is the primary package allowance used by the estimator.
Flooring & Tile
Step 03
Products & supplier preference
Choose the intended fixture level. Product costs shown
in the estimate are allowances rather than fixed supplier
retail prices.
Preferred Product Suppliers
Optional. Supplier preference does not automatically
change the planning estimate.
Product sourcing note:
Built Wright may source bathroom products and renovation
materials from the supplier network below. Product prices
vary by supplier, brand, model, size, finish, stock,
promotion and delivery. The estimator therefore uses
product allowances rather than treating any supplier's
website price as the guaranteed project cost.
Plumbing relocation, custom cabinetry, stone, heated
flooring and concealed-condition work are treated as
separately scoped allowances.
Accessibility Bathroom Conversion selected:
the fixed base quotation is CAD $15,000 and includes
safety-focused work, a shower chair/bench and bathtub-to-shower
conversion. The existing toilet and vanity/sink remain unchanged.
Only optional items selected below are added to the $15,000 base.
Add-On Allowances
Include estimated GST / HST
Ontario uses 13% HST. Other provinces use the
estimator's GST/HST planning rate only.
Preliminary Estimate
Built Wright project estimate
Labour and material allowances are kept separate and
all selected project specifications are recorded below.
Estimated Project Range
CAD $0 – $0
Planning range is approximately ±7% around the
calculated midpoint. Final pricing requires site
inspection and confirmed product selections.
Planning Midpoint
$0
Before applicable tax.
Labour$0
Materials$0
Pre-Tax$0
GST / HST$0
Selected Project Specifications
Itemized Labour & Material Estimate
Scope / Allowance
Labour
Materials
Total
Budget estimate only.
Pricing is based on Built Wright estimator planning
allowances and is not a binding quotation. Product prices
may vary between suppliers. Hidden plumbing, structural
conditions, concealed water damage, asbestos/hazardous
materials, custom cabinetry, special stone, unusual
electrical work, permit requirements and site conditions
may affect final pricing.