Bathroom Renovation Estimator

Create a preliminary bathroom renovation budget with labour and material allowances shown separately. Package pricing is based on Built Wright estimator planning data, then adjusted for bathroom size, scope and selected upgrades.

Built Wright Estimator Planning Model
Project Package Products Upgrades Estimate
Step 01

Project details

Choose the bathroom configuration and enter the approximate dimensions of the renovation area.

Bathroom Package

These configurations follow the supplied Built Wright estimator training matrix. The Accessibility Bathroom Conversion is a fixed CAD $15,000 base package; optional upgrades selected later are added separately.

Approximate Dimensions

Used to adjust the package allowance above or below its reference bathroom size.

Project Timing

Step 02

Scope & finish package

The Basic, Upgraded and Premium packages use the supplied Built Wright labour/material matrix. Scoped changes are then added or removed separately.

Renovation Scope

Standard assumes the existing footprint and plumbing locations generally remain unchanged.

Finish Package

This is the primary package allowance used by the estimator.

Flooring & Tile

Step 03

Products & supplier preference

Choose the intended fixture level. Product costs shown in the estimate are allowances rather than fixed supplier retail prices.

Preferred Product Suppliers

Optional. Supplier preference does not automatically change the planning estimate.

Product sourcing note: Built Wright may source bathroom products and renovation materials from the supplier network below. Product prices vary by supplier, brand, model, size, finish, stock, promotion and delivery. The estimator therefore uses product allowances rather than treating any supplier's website price as the guaranteed project cost.
Step 04

Trades, conditions & upgrades

Plumbing relocation, custom cabinetry, stone, heated flooring and concealed-condition work are treated as separately scoped allowances.

Accessibility Bathroom Conversion selected: the fixed base quotation is CAD $15,000 and includes safety-focused work, a shower chair/bench and bathtub-to-shower conversion. The existing toilet and vanity/sink remain unchanged. Only optional items selected below are added to the $15,000 base.

Add-On Allowances

Include estimated GST / HST Ontario uses 13% HST. Other provinces use the estimator's GST/HST planning rate only.
Preliminary Estimate

Built Wright project estimate

Labour and material allowances are kept separate and all selected project specifications are recorded below.

Estimated Project Range
CAD $0 – $0

Planning range is approximately ±7% around the calculated midpoint. Final pricing requires site inspection and confirmed product selections.

Planning Midpoint $0

Before applicable tax.

Labour $0
Materials $0
Pre-Tax $0
GST / HST $0

Selected Project Specifications

Itemized Labour & Material Estimate
Scope / Allowance Labour Materials Total
Budget estimate only. Pricing is based on Built Wright estimator planning allowances and is not a binding quotation. Product prices may vary between suppliers. Hidden plumbing, structural conditions, concealed water damage, asbestos/hazardous materials, custom cabinetry, special stone, unusual electrical work, permit requirements and site conditions may affect final pricing.